We have
the knowledge

Worldwide

Referenssit

Hyvä työn jälki puhuu puolestaan. Meille paras osoitus työssämme onnistumisesta on tyytyväinen asiakas.

Varmuus aikatauluissa ja työn korkea laatu ovat asioita, joista olemme kyenneet pitämään kiinni – projektissa kuin projektissa. Näistä myös asiakkaamme ovat meitä kiittäneet.

Valmet AB, Södra Cell Värö Mill expansion

Fiberline piping installation

Being the biggest project in the company’s history, Nordic Power Service delivered Fiberline Piping Installation to Södra Cell Värö Mill in Sweden, as main contractor to Valmet Ab. Project was started with workshop prefabrication and site preparations at second half of 2015. Site installations were started half a year before the main mill shut down in May-June, and project was completed in August 2016. Installations included in addition to the main portion of stainless steel piping certain special materials as titanium, and also large scope of FRP (Fiberglass Reinforced Polymer) piping. Delivery scope covered also scaffolding works and NDT inspections by the respective subcontractors. Project’s main challenge was tight shut down period schedule. During the mill shut down peak installation NPS overall site allocation was over 200 persons. Project execution was successful, evidencing NPS capability to run large and demanding project deliveries.

Valmet, Helen Salmisaaren Voimalaitos

SCR savukaasujen puhdistuslaitteiston asennus

Toimitimme Valmetin toimeksiantamana HELEN Salmisaaren voimalaitokselle kesällä 2015 uutta teknologiaa edustavan savukaasujen puhdistuslaitteiston asennuksen. Uuden menetelmän avulla voimalaitos pystyy entistä tehokkaammin vähentämään typpioksidipäästöjä ja alittamaan EU:n uuden teollisuuspäästödirektiivin mukaiset päästörajat. Osa laitteistoista, putkistosta ja kanavistosta asennettiin täysin uusiin tiloihin kuten urean vastaanottorakennukseen ja hydrolysaattoritilaan. Katalyyttielementit sekä niitä edeltävä ja seuraava kanavisto sijoitettiin mittavana lisäosana olemassa olevaan savukaasukanavistoon. Toteutuksessa  käytettiin monipuolisesti asennuksen ammattitaitoamme, putkisto-, teräsrakenne- ja kanavahitsaustöiden lisäksi vaativat nostot ja osien haalaukset olivat merkittävä osa projektia. NPS toimituslaajuuteen kuuluivat myös NDT tarkastukset.

Valmet, Mondi Dynäs AB

Modernisointi

Tämä erityisen vaativa modernisointi projekti toteutettiin yhdessä Valmetin ja Mondi Dynäsin kanssa keväällä 2015. Projektiin kuului uuden primääritulistimen ja kattoputkien asennus. Työhön kuului myös tulistimien yhdysputkien muutokset ja nuohoimien ja seinäpanelien asennus, sekä erityisen vaativa ilma-aukkojen korvaaminen luukku hitsauksilla. Lisäksi modifioitiin kattilan alaosan ilmansyöttöjärjestelmä ja asennettiin uusi keittopinnan tuhkasuppilo kuljettimineen. Sulakouruille asennettiin uusi puhdistusrobotti. Onnistuminen vaativissa modernisointi projekteissa on omiaan kuvaamaan NPS tiimin korkeaa ammattitaitoa ja maailmanluokan osaamista modernisointi töiden suunnittelussa ja toteutuksessa.

Diamond Power Finland Oy

NPS ja Diamond Power Finland Oy ovat solmineet yhteistyösopimuksen koskien Diamond Powerin tuotevalikoiman asennuksia sekä tuotteiden teollisuuden laitoksilla tapahtuvia huoltoja. Kiitämme Diamond Poweria luottamuksesta ja panostamme laadukkaan yhteistyön tekemiseen myös jatkossa.

”Sopimuksessa yhdistyy Diamond Powerin maailmanlaajuisesti tunnustetut laadukkaat tuotteet sekä NPS:n luotettava ja joustava asennustoiminta. Yhdessä pystymme tarjoamaan asiakkaillemme selkeää lisä-arvoa markkinoiden parhailla toimituksilla” Jukka Vanninen, Managing Director, Diamond Power Finland Oy.

Metso Power, Kuopion Energia Oy

Arinakattilan modernisointi leijupetikattilaksi

Toteutimme Metso Powerille ja Kuopion Energialle haastavan modernisointiprojektin, jossa muunsimme vanhan arinakattilan moderniksi leijupetikattilaksi. Olimme mukana projektissa jo suunnitteluvaiheesta alkaen, ja toteutimme sen tiiviissä yhteistyössä asiakkaan kanssa.

Projekti edustaa voimalaitosmodernisoinneissa suurinta mahdollista kokoluokkaa, ja se on yrityksemme historian toistaiseksi suurin yksittäinen toimitus. Tässä hankkeessa pääsimme toteuttamaan osaamistamme koko laajuudessaan, asennussuunnittelusta aina NDT-tarkastuksiin saakka.

Andritz, Kotka Mills Oy

Soodakattilan pohjanvaihto

Toteutimme Andritzille ja Kotka Millsille erittäin vaativan soodakattilan pohjanvaihtoprojektin. Projektissa oli useita haastavia elementtejä, ja siinä onnistuminen ilmentää hyvin yrityksemme ydinosaamista ja tiimimme ammattitaitoa.

Kattilan tangenttiputkilla toteutettu seinäratkaisu ja Sanicro38-materiaali toivat tiukan aikataulun ohella pohjanvaihtoon omat erityishaasteensa. Onnistuimme projektissa hyvin ja suoritimme työn maailmanennätysvauhdilla, vain 6,5 vuorokaudessa.

Valmet, Bio Golden Delfzijl, Hollanti

Voimalaitoksen primääritulistimen uusinta sekä voimalaitoksen kunnossapitotyöt

Valmetille toteutimme Raandin Hollannissa sijaitsevalle tehtaalle primääritulistimen uusinnan ja voimalaitoksen kunnossapitotyöt avaimet käteen -periaatteella. Hanke toimii hyvänä esimerkkinä kokonaisvaltaisista projektointipalveluistamme, ja kertoo samalla Saksan yksikkömme korkeasta osaamistasosta. Laajassa hankkeessa onnistuminen osoitti samalla, kuinka saumattomasti NPS-emoyhtiön ja NPS GmbH:n välinen yhteistyö toimii.

Muita referenssejä

  • refe_andritz

    IGGESUND WORKINGTON, UNITED KINGDOM

    - Manhole door openings to superheater area
    – Flue Gas Duct expansion bellow replacement
    – Grid nozzles replacement
    – Boiler maintenance works

  • refe_fosterwheeler

    UPM SHOTTON, UNITED KINGDOM.

    - BFB boiler rear wall partial replacement
    – Superheater bends replacement
    – SH covershields replacement

  • valmet_logo

    METSÄ FIBRE JOUTSENO. RECOVERY BOILER

    - Tertiary openings replacement
    – Front and rear wall repair panel replacement
    – Sootblower openings replacement
    – Boilerbank ties renewing
    – Smelt spouts replacemet

  • refe_andritz

    STORA ENSO, UIMAHARJU MILL, EVAPORATOR

    - Replacement of lamella package for concentrator 1B

  • refe_andritz

    STORA ENSO, IMATRA MILL, EVAPORATOR H5

    - Replacement of lamella packages for concentrator 1B and 1C

  • refe_andritz

    UPM, KAUKAS MILL, EVAPORATOR

    - Replacement of lamella packages for concentrator 1A, 1B and 1C
    – Replacement of circulation pipes
    – Replacement of liquir distribution systems
    – Replacement of flashtank including new piping
    – Installations of new pumps

  • valmet_logo

    SÖDRA CELL VÄRÖ, EVAPORATOR

    - Modification of evaporator vessels droplet separators

  • refe_andritz

    MONDI, STETI MILL, EVAPORATOR

    - Replacement of evaporator unit tube bundle

  • valmet_logo

    Valmet Oy. EON UK, Steven`s Croft Power Station, Lockerbie Scotland. BFB Boiler Upgrade

    - Furnace lower part walls replacement. Inconel overlay welded panels
    – Replacement of Hybex grid
    – Replacement of furnace nose and screen tubes
    – Replacement of primary superheater
    – Upgrade for economizers 1 – 3
    – Installation of eco`s sootblowers and piping
    – Feedwaterpipe installation
    – Primary airduct modification
    – Flue gas duct modification
    – Platform modification

  • refe_andritz

    Stora Enso, Imatra Mill, evaporator H5

    - Replacement of lamella packages for concentrator 1A and surface condenser

  • valmet_logo

    Metsä Board, Husum Mill BP 9

    - Replacement of superheater 1 and 2
    – Re-location of sootblowers

  • refe_andritz

    Stora Enso, Uimaharju Mill

    - Replacement of lamella packages for evaporator units 1A and 1C

  • valmet_logo

    Stora Enso, Uimaharju Mill

    - New flue gas coolers for recovery boiler

  • refe_andritz

    Iggesund Workington, United Kingdom

    - Air preheater replacement. Cold secondary and cold primary packets. Total weight of 150 tons.
    – New safety valve silencer with piping
    – Grid nozzles replacement, 1500 pc.
    – Boiler maintenance works

  • valmet_logo

    Bio Golden Raand`s power plant in Delfzijl, Netherlands

    - Primary Superheater replacement
    – Boiler maintenance works

  • Rotem

    Pama power plant, CFB boiler

    - ash cooler replacemt
    – left side wall replacement
    – rear wall replacement

  • valmet_logo

    Porvoon Energia Oy

    Tampella Boiler renewals as follows:

    – Air preheater replacement
    – Load burner replacement including new piping and ducting installation

  • valmet_logo

    Mondi Dynäs AB

    Recovery boiler bottom replacement

  • refe_andritz

    ZAO International Paper Svetogorsk Mill, evaporator

    Three Lamella Packages Replacement on Concentrators A, B and C

  • valmet_logo

    UPM Kaukas

    Recovery Boiler tertiary superheater replacement

  • refe_metso

    Neste Oil Oyj

    K1 boiler renewal as follows:

    – K1 boiler bottom replacement
    – Secondary Superheater replacement

  • refe_metso

    SCA Munksund AB

    CFB boiler renewal as follows:

    – Economizer packets, 3 pcd
    – Modifying of hot gas duct
    – Pipeline modifications
    – Platform modifications
    – Repair of ash hoppers

    Recovery Boiler renewals as follows:

    – New low pressure piping installation
    – Installation of two additional flue gas cooler packets
    – Steel structure installation for additional flue gas cooler

  • refe_fosterwheeler

    Rovaniemen Energia Oy

    CFB boiler air and fuel feeding system renewal as follows:

    – Furnace frontwall
    – Air ducts
    – Rezi gas duct
    – Fuel chutes
    – Low pressure piping
    – Fuel feeding conveyors and screws
    – Platform modifications

  • refe_andritz

    Kotka Mills Oy

    Recovery boiler bottom replacement as follows:

    – Bottom replacement
    – Primary air ducts and registers
    – Secondary air ducts and registers
    – Downcomers with distribution pipes
    – Low pressure piping
    – Smelt spouts and minihoods
    – Start up burners
    – Bottom material Sanicro38

  • refe_metso

    Kuopion Energia Oy

    HP 2 Boiler retrofit as follows:
    – installation planning
    – installation schedules
    – manpower planning
    – second pass demolition
    – second pass installation
    – furnace and bottom installation
    – ducting installation
    – HP piping installation
    – MP piping installation
    – NDT Inspections

  • refe_fosterwheeler

    Jyväskylän Energia Oy

    CFB Boiler retrofit as follows:
    – By pass economizer replacement
    – Installation of new recirculation gas duct and fan
    – Platforms modifications and renewals
    – Spray water valve group modifications
    – Sootblowers and sootblower pipelines modifiacation
    – Fan room, new coils silo and electrical room steel structure installation

  • refe_andritz

    Stora Enso Oy

    Recovery Boiler economizer replacement with eco casing, ashhoppers and conveyors

  • refe_fosterwheeler

    Utzenstorf Papierfabrik

    CFB- boiler additional economizer installation works. Includes pipelines, ducting and platform renewals and modifications

  • refe_fosterwheeler

    HVC Bio-energiecentrale

    CFB- boiler rear wall and kick-out area replacement

  • refe_YIT

    Metsä-Botnia

    Recovery Boiler Primary and Secondary airpreheater packet replacement

  • refe_YIT

    AB Fortum Värme

    Cooling water system and process piping installation

  • refe_metso

    Stora Enso Oy

    BFB Boiler Front Wall replacement

  • refe_diamondpower

    Stora Enso Oy

    Recovery Boiler sootblowers and sootblower piping renewal in economizer area, Varkaus

  • refe_diamondpower

    Stora Enso Oy

    Recovery Boiler sootblowers and sootblower piping renewal in economizer area, Kemi