REFERENSSIT – Nordic Power Service Oy

HYVÄ TYÖN JÄLKI PUHUU PUOLESTAAN –
MEILLE PARAS OSOITUS ONNISTUMISESTA ON TYYTYVÄINEN ASIAKAS.

Varmuus aikatauluissa ja työn korkea laatu ovat asioita, joista olemme kyenneet pitämään kiinni.

VALMET AB, SCA ÖSTRAND EVAP

SCA Östrand, Evaporator plant installation

Nordic Power Service Oy delivered under contract with Valmet AB, SCA Östrand Mill Evaporation plant main and auxiliary equipment, and piping installations among the overall mill expansion project. Delivery included also full supply and management of piping prefabrication including materials, as well as NDT inspections and tower cranes for lifting. Project became the biggest delivery in NPS history.

Project preparations and prefabrication was started end of 2016, and site works in March 2017. Mechanical Completion was achieved in October 2017. At the mill shut down peak installation NPS overall site allocation was nearby 200 persons. Total piping length reached over 13 km, total weight of installed equipment over 2250 tons, biggest individual equipment lifted being 230 tons with height over 23 m. Project was challenging due to extremely short overall installation schedule. Evaporation plant full operation in commercial use took place soon after commissioning period in the beginning of 2018, and the plant is functioning well.

VALMET AB, SÖDRA CELL VÄRÖ MILL EXPANSION
Fiberline piping installation

Being the biggest project in the company’s history, Nordic Power Service delivered Fiberline Piping Installation to Södra Cell Värö Mill in Sweden, as main contractor to Valmet Ab. Project was started with workshop prefabrication and site preparations at second half of 2015. Site installations were started half a year before the main mill shut down in May-June, and project was completed in August 2016. Installations included in addition to the main portion of stainless steel piping certain special materials as titanium, and also large scope of FRP (Fiberglass Reinforced Polymer) piping. Delivery scope covered also scaffolding works and NDT inspections by the respective subcontractors. Project’s main challenge was tight shut down period schedule. During the mill shut down peak installation NPS overall site allocation was over 200 persons. Project execution was successful, evidencing NPS capability to run large and demanding project deliveries.

VALMET, HELEN SALMISAAREN VOIMALAITOS
SCR savukaasujen puhdistuslaitteiston asennus

Toimitimme Valmetin toimeksiantamana HELEN Salmisaaren voimalaitokselle kesällä 2015 uutta teknologiaa edustavan savukaasujen puhdistuslaitteiston asennuksen. Uuden menetelmän avulla voimalaitos pystyy entistä tehokkaammin vähentämään typpioksidipäästöjä ja alittamaan EU:n uuden teollisuuspäästödirektiivin mukaiset päästörajat. Osa laitteistoista, putkistosta ja kanavistosta asennettiin täysin uusiin tiloihin kuten urean vastaanottorakennukseen ja hydrolysaattoritilaan. Katalyyttielementit sekä niitä edeltävä ja seuraava kanavisto sijoitettiin mittavana lisäosana olemassa olevaan savukaasukanavistoon. Toteutuksessa  käytettiin monipuolisesti asennuksen ammattitaitoamme, putkisto-, teräsrakenne- ja kanavahitsaustöiden lisäksi vaativat nostot ja osien haalaukset olivat merkittävä osa projektia. NPS toimituslaajuuteen kuuluivat myös NDT tarkastukset.

VALMET, MONDI DYNÄS AB
Modernisointi

Tämä erityisen vaativa modernisointi projekti toteutettiin yhdessä Valmetin ja Mondi Dynäsin kanssa keväällä 2015. Projektiin kuului uuden primääritulistimen ja kattoputkien asennus. Työhön kuului myös tulistimien yhdysputkien muutokset ja nuohoimien ja seinäpanelien asennus, sekä erityisen vaativa ilma-aukkojen korvaaminen luukku hitsauksilla. Lisäksi modifioitiin kattilan alaosan ilmansyöttöjärjestelmä ja asennettiin uusi keittopinnan tuhkasuppilo kuljettimineen. Sulakouruille asennettiin uusi puhdistusrobotti. Onnistuminen vaativissa modernisointi projekteissa on omiaan kuvaamaan NPS tiimin korkeaa ammattitaitoa ja maailmanluokan osaamista modernisointi töiden suunnittelussa ja toteutuksessa.

DIAMOND POWER FINLAND OY

NPS ja Diamond Power Finland Oy ovat solmineet yhteistyösopimuksen koskien Diamond Powerin tuotevalikoiman asennuksia sekä tuotteiden teollisuuden laitoksilla tapahtuvia huoltoja. Kiitämme Diamond Poweria luottamuksesta ja panostamme laadukkaan yhteistyön tekemiseen myös jatkossa.

”Sopimuksessa yhdistyy Diamond Powerin maailmanlaajuisesti tunnustetut laadukkaat tuotteet sekä NPS:n luotettava ja joustava asennustoiminta. Yhdessä pystymme tarjoamaan asiakkaillemme selkeää lisä-arvoa markkinoiden parhailla toimituksilla” Jukka Vanninen, Managing Director, Diamond Power Finland Oy.

METSO POWER, KUOPION ENERGIA OY
Arinakattilan modernisointi leijupetikattilaksi

Toteutimme Metso Powerille ja Kuopion Energialle haastavan modernisointiprojektin, jossa muunsimme vanhan arinakattilan moderniksi leijupetikattilaksi. Olimme mukana projektissa jo suunnitteluvaiheesta alkaen, ja toteutimme sen tiiviissä yhteistyössä asiakkaan kanssa.

Projekti edustaa voimalaitosmodernisoinneissa suurinta mahdollista kokoluokkaa, ja se on yrityksemme historian toistaiseksi suurin yksittäinen toimitus. Tässä hankkeessa pääsimme toteuttamaan osaamistamme koko laajuudessaan, asennussuunnittelusta aina NDT-tarkastuksiin saakka.

ANDRITZ, KOTKA MILLS OY
Soodakattilan pohjanvaihto

Toteutimme Andritzille ja Kotka Millsille erittäin vaativan soodakattilan pohjanvaihtoprojektin. Projektissa oli useita haastavia elementtejä, ja siinä onnistuminen ilmentää hyvin yrityksemme ydinosaamista ja tiimimme ammattitaitoa.

Kattilan tangenttiputkilla toteutettu seinäratkaisu ja Sanicro38-materiaali toivat tiukan aikataulun ohella pohjanvaihtoon omat erityishaasteensa. Onnistuimme projektissa hyvin ja suoritimme työn maailmanennätysvauhdilla, vain 6,5 vuorokaudessa.

VALMET, BIO GOLDEN DELFZIJL, HOLLANTI
Voimalaitoksen primääritulistimen uusinta sekä voimalaitoksen kunnossapitotyöt

Valmetille toteutimme Raandin Hollannissa sijaitsevalle tehtaalle primääritulistimen uusinnan ja voimalaitoksen kunnossapitotyöt avaimet käteen -periaatteella. Hanke toimii hyvänä esimerkkinä kokonaisvaltaisista projektointipalveluistamme, ja kertoo samalla Saksan yksikkömme korkeasta osaamistasosta. Laajassa hankkeessa onnistuminen osoitti samalla, kuinka saumattomasti NPS-emoyhtiön ja NPS GmbH:n välinen yhteistyö toimii.

Muita referenssejä

Oulu Pulp Mill

Piping installation for the fiberline modernization

Kaukas Pulp Mill

Rebuild of RV4 reduction valve and high pressure piping

  • Delivery of materials
  • Prefabrication
  • Installation
  • NDT
  •  

Kaukas Pulp Mill

Rebuild of TG9 process piping for turbine efficiency increase

  • Delivery of materials
  • Prefabrication
  • Installation
  • NDT
  •  

Stora enso sunila

Replacement of K2 air preheater 1, 2 and 3

  • Manufacturing of pre heater at NPS workshop

Stora enso Kaukopää

Replacement of KK2 econiomizer 1A

Lockerbie BFB boiler, Boiler walls replacement
  • Furnace upper part front and sidewalls replacement
  • Second Pass side walls replacement
  • Airpreheater replacement
  • Grid Nozzless replacement
  • Main Steam line valves replacement
  • Boiler maintenance works

Kaukopää SK5, Recovery boiler bottom replacement
  • Coumpound and Sanicro materials
  • Installation time 9.5 days
  • Pressure parts NDT inspections

Blackburn Meadows, Tertiary superheater replacement
  • Inconell overlay welding at site

Blackburn Meadows, HEX piping
  • Heat Exchanger piping installation
  • Heat Exchanger installation

Kaukopää SK5, Sootblower piping installation
  • Piping prefabrication at NPS workshop
  • Site welds NDT, RT 100%

IGGESUND, HOLMEN GROUP, RB5, SWEDEN
  • Replacement of recovery boiler air openings

RIIKINVOIMA OY
  • CFB Boiler econimizer replacement

MONDI RUZOMBEROK, SLOVAKIA
  • Replacement of lamella packages for evaporator 2A and 2B.

 EON BLACKBURN MEADOWS UK

  • BFB boiler furnace upper part replacement

UPM CALEDONIAN PAPER UK
  • BFB boiler economizer replacement

UPM KAUKAS
  • Replacement of lamella packages for evaporator 2B and 2C
  • Modernization of vapour ducts, condensate and steam piping

KAPPA SMURFIT PITEÅ
  • Recovery boiler upgrade

  • DTWG system, piping and equipment installation

IGGESUND WORKINGTON, UNITED KINGDOM
  • Manhole door openings to superheater area
  • Flue Gas Duct expansion bellow replacement
  • Grid nozzles replacement
  • Boiler maintenance works

STORA ENSO, UIMAHARJU MILL, EVAPORATOR
  • Replacement of lamella package for concentrator 1B.

STORA ENSO, IMATRA MILL, EVAPORATOR H5
  • Replacement of lamella packages for concentrator 1B and 1C.

UPM, KAUKAS MILL, EVAPORATOR
  • Replacement of lamella packages for concentrator 1A, 1B and 1C
  • Replacement of circulation pipes
  • Replacement of liquir distribution systems
  • Replacement of flashtank including new piping
  • Installations of new pumps

MONDI, STETI MILL, EVAPORATOR
  • Replacement of evaporator unit tube bundle.

VALMET OY. EON UK, STEVEN`S CROFT POWER STATION, LOCKERBIE SCOTLAND. BFB BOILER UPGRADE
  • Furnace lower part walls replacement. Inconel overlay welded panels
  • Replacement of Hybex grid
  • Replacement of furnace nose and screen tubes
  • Replacement of primary superheater
  • Upgrade for economizers 1-3
  • Installation of eco`s sootblowers and piping
  • Feedwaterpipe installation
  • Primary airduct modification
  • Flue gas duct modification
  • Platform modification.

METSÄ FIBRE JOUTSENO. RECOVERY BOILER
  • Tertiary openings replacement
  • Front and rear wall repair panel replacement
  • Sootblower openings replacement
  • Boilerbank ties renewing
  • Smelt spouts replacement

SÖDRA CELL VÄRÖ, EVAPORATOR
  • Modification of evaporator vessels droplet separators

METSÄ BOARD, HUSUM MILL BP 9
  • Replacement of superheater 1 and 2.Re-location of sootblowers

STORA ENSO, UIMAHARJU MILL
  • Replacement of lamella packages for evaporator units 1A and 1C

STORA ENSO, UIMAHARJU MILL
  • New flue gas coolers for recovery boiler

IGGESUND WORKINGTON, UNITED KINGDOM
  • Air preheater replacement
  • Cold secondary and cold primary packets. Total weight of 150 tons.
  • New safety valve silencer with piping. Grid nozzles replacement, 1500 pc.
  • Boiler maintenance works.

BIO GOLDEN RAAND`S POWER PLANT IN DELFZIJL, NETHERLANDS
  • Primary Superheater replacement
  • Boiler maintenance works

PAMA POWER PLANT, CFB BOILER
  • Ash cooler replacement
  • Left side wall replacement
  • Rear wall replacement

PORVOON ENERGIA OY

Tampella Boiler renewals as follows:

  • Air preheater replacement
  • Load burner replacement including new piping and ducting installation

MONDI DYNÄS AB
  • Recovery boiler bottom replacement

ZAO INTERNATIONAL PAPER SVETOGORSK MILL, EVAPORATOR
  • Three Lamella Packages Replacement on Concentrators A, B and C

UPM KAUKAS
  • Recovery Boiler tertiary superheater replacement

NESTE OIL OYJ

K1 boiler renewal as follows:

  • K1 boiler bottom replacement
  • Secondary Superheater replacement

SCA MUNKSUND AB

CFB boiler renewal as follows:

  • Economizer packets, 3 pcd
  • Modifying of hot gas duct
  • Pipeline modifications. Platform modifications
  • Repair of ash hoppers

Recovery Boiler renewals as follows:

  • New low pressure piping installation
  • Installation of two additional flue gas cooler packets
  • Steel structure installation for additional flue gas cooler

KOTKA MILLS OY

Recovery boiler bottom replacement as follows:

  • Bottom replacement
  • Primary air ducts and registers
  • Secondary air ducts and registers
  • Downcomers with distribution pipes
  • Low pressure piping
  • Smelt spouts and minihoods
  • Start up burners
  • Bottom material Sanicro38

KUOPION ENERGIA OY

HP 2 Boiler retrofit as follows:

  • Installation planning
  • Installation schedules
  • Manpower planning
  • Second pass demolition
  • Second pass installation
  • Furnace and bottom installation
  • Ducting installation
  • HP piping installation
  • MP piping installation
  • NDT Inspections

STORA ENSO OY
  • Recovery Boiler economizer replacement with eco casing, ashhoppers and conveyors

STORA ENSO OY
  • BFB Boiler Front Wall replacement

STORA ENSO OY
  • Recovery Boiler sootblowers and sootblower piping renewal in economizer area, Varkaus

STORA ENSO OY
  • Recovery Boiler sootblowers and sootblower piping renewal in economizer area, Kemi

UPM SHOTTON, UNITED KINGDOM.
  • BFB boiler rear wall partial replacement
  • Superheater bends replacement
  • SH covershields replacement

ROVANIEMEN ENERGIA OY

CFB boiler air and fuel feeding system renewal as follows:

  • Furnace frontwall
  • Air ducts
  • Rezi gas duct
  • Fuel chutes
  • Low pressure piping
  • Fuel feeding conveyors and screws
  • Platform modifications

JYVÄSKYLÄN ENERGIA OY

CFB Boiler retrofit as follows: 

  • By pass economizer replacement
    Installation of new recirculation gas duct and fan
  • Platforms modifications and renewals
  • Spray water valve group modifications
  • Sootblowers and sootblower pipelines modifiacation
  • Fan room, new coils silo and electrical room steel structure installation

UTZENSTORF PAPIERFABRIK
  • CFB- boiler additional economizer installation works. Includes pipelines, ducting and platform renewals and modifications

HVC BIO-ENERGIECENTRALE
  • CFB- boiler rear wall and kick-out area replacement

METSÄ-BOTNIA
  • Recovery Boiler Primary and Secondary airpreheater packet replacement

AB FORTUM VÄRME
  • Cooling water system and process piping installation

UPM KAUKAS EVAPORATOR UPGRADE
  • Installation of new super concentrator 1D/E
  • Installation of mechanical equipments
  • Installation of new pipelines and supports

STORA ENSO VEITSILUOTO RB
  • Superheater 1 and 2 replacement
  • Screen tube replacement
  • Installation of new dissolving tank

STORA ENSO KAUKOPÄÄ SK5
  • Superheater 1 and 2 replacement
  • Screen tube replacement
  • Installation of new dissolving tank

EON BLACKBURN MEADOWS RENEWABLE ENERGY PLANT
  • BFB boiler tertiary superheater partial renewal
  • Wall panel replacement
  • Grid nozzle replacement

SCA MANNHEIM HYGIENE PRODUCTS GMBH
  • Replacement of lamella package for evaporator concentrator 2

METSÄ FIBRE RAUMA
  • Replacement of lamella package for evaporator concentrator 2
  • Replacement of evaporator
  • 1D concentrator end shell
  • Pipeline modification